Award of Dredging, Welding and Installation of a 1600mm PN10 Outfall pipeline in Sharjah

Award of Dredging, Welding and Installation of a 1600mm PN10 Outfall pipeline in Sharjah

Union Dredgers has been awarded the marine scope of works for the Extension of an Outfall Pipeline in Sharjah. UDMC’s scope includes

  • Removal of existing breakwater
  • Dredging of a 2km trench
  • HDPE welding of a 2km 1600mm HDPE pipeline
  • Construction of a HDPE Diffuser
  • Installation including Bedding, Pipeline installation and backfilling
  • Construction of a new revetment
  • Creation of a new beach profile after project works is completed

We are looking forward to working with our client and we will be utilizing our fleet of equipment and our skilled project and site team to complete works as per the schedule.