Supply and Installation of OD500mm HDPE Outfall Pipeline in Khorfakkan Area

Supply-and-Installation-of-OD500mm-HDPE-Outfall-Pipeline-in-Khorfakkan-Area.jpg

Supply and Installation of OD500mm HDPE Outfall Pipeline in Khorfakkan Area

Union Dredgers & Marine Contracting (UDMC) site team has commenced mobilization of our latest project that entails the comprehensive supply and installation of a OD500mm HDPE outfall pipeline spanning 1.3km in the vibrant Khorfakkan area. This critical infrastructure initiative involves several key components to ensure seamless operation and environmental compliance.

The Project Scope Of Work Can Be Summarized As Follows:

  • Supply of Materials: Supply of high-quality PE pipes, fittings, outfall diffuser system, concrete anchor blocks, and essential fasteners to support robust pipeline construction.
  • Micro Tunneling for Road Crossings: Utilization of advanced micro tunneling techniques for road crossings to minimize surface disruption and ensure efficient pipeline installation.
  • Sheet Piling and Dewatering: Installation of temporary sheet piles to facilitate dry working conditions during pipeline installation in waterlogged areas, coupled with effective dewatering strategies.
  • Butt Fusion Welding: Precise butt fusion welding of PE pipes and fittings to create strong, leak-free joints essential for long-term pipeline integrity.
  • Offshore Excavation and Pipe Laying: Expert excavation offshore to create a subsea trench for accurate placement of the HDPE pipeline, adhering meticulously to alignment and depth specifications.
  • Surveys and As-Built Drawings: Thorough pre-installation and post-installation surveys to ensure precise alignment and condition recording for comprehensive as-built drawings, crucial for future maintenance and upgrades.
  • Offshore Backfilling and Leveling: Methodical backfilling of excavated trenches with suitable materials and precise leveling to restore surface stability and integrity post-installation.
  • Breakwater Management: Careful removal and subsequent reinstatement of existing breakwater sections as required, ensuring minimal disruption while accommodating pipeline installation needs.
  • Testing and Commissioning: Rigorous testing protocols, including pressure tests and operational checks, to verify the functionality, safety, and reliability of the installed pipeline system.

Supply-and-Installation-of-OD500mm-HDPE-Outfall-Pipeline-in-Khorfakkan-Area1

Union Dredgers & Marine Contracting (UDMC) has a demonstrated capability and specialisation in completing outfall and intake projects and by integrating advanced technologies and meticulous project management, we ensure the successful delivery of durable and efficient pipeline systems.

For enquiries or additional information about our comprehensive pipeline solutions or other services, please contact us today.