Installation of two 1200mm diameter pipe lines of 350 metres each and the installation of three outfall pipe lines with sizes of 1000 mm and 630mm at Ras Al Khaimah
Installation of Intake/Outfall pipeline at IWP plant
Recent News
Dredging Works Begin for Seawater Outfall Line at Palm Jebel Ali
August 20, 2025
500mm HDPE Outfall Pipeline Installed in Khorfakkan Area
January 2, 2025
Marine Vessels for Hire with Crew for Coastal Dredging in the UAE
November 4, 2024
Remora vessel
August 16, 2023