Union Dredgers Marine Contracting
  • Home
  • About Us
  • Services
    • Dredging
    • Offshore Pipeline Installation
    • Marine Services
    • Marine Construction
    • Equipment Hire
    • Custom Fabrication
  • Projects
  • Equipment
  • News
  • Contact Us
  • Home
  • About Us
  • Services
    • Dredging
    • Offshore Pipeline Installation
    • Marine Services
    • Marine Construction
    • Equipment Hire
    • Custom Fabrication
  • Projects
  • Equipment
  • News
  • Contact Us
Download Catalog Download Catalog
Union Dredgers Marine Contracting
  • Home
  • About Us
  • Services
    • Dredging
    • Offshore Pipeline Installation
    • Marine Services
    • Marine Construction
    • Equipment Hire
    • Custom Fabrication
  • Projects
  • Equipment
  • News
  • Contact Us
  • Home
  • About Us
  • Services
    • Dredging
    • Offshore Pipeline Installation
    • Marine Services
    • Marine Construction
    • Equipment Hire
    • Custom Fabrication
  • Projects
  • Equipment
  • News
  • Contact Us
Dredging Works
by adminFebruary 20, 2018in Dredging Projects

Dredging Works & Underwater Cutting & Removal Of Obstructions at Dubai Marina Quays

The supply of marine equipment & dredging of soft sand materials at Dubai marina to a depth of up to 3.5m. Works involved Underwater Cutting and removal of the metal beams and rods which were projecting from the sea bed. Dismantling and removing from site the concrete blocks and boulders

Read More
Offshore Pipe line Installation
by adminFebruary 20, 2018in Offshore Pipeline Installation Projects

Offshore Pipe line Installation for Khorfakkan desalination plant

Re installation of offshore Pipeline A along with Air Backwash & Chlorination pipelines for 5 MIGD Seawater Desalination Plant at Khorfakkan and Re installation of offshore pipeline B 5 MIGD Seawater Desalination Plant at Khorfakkan.

Read More
intake outfall pipeline
by adminFebruary 20, 2018in Offshore Pipeline Installation Projects

Installation of Intake/Outfall pipeline at IWP plant

Installation of two 1200mm diameter pipe lines of 350 metres each and the installation of three outfall pipe lines with sizes of 1000 mm and 630mm at Ras Al Khaimah

Read More
top dredging company in UAE
by adminFebruary 20, 2018in Dredging Projects

Dredging Works under bridges Rock revetment under bridges 1 & 2

Excavation and removal of materials under the bridges 1,2,12 & 13 and disposal of excavated materials to a distance of 5 kilometers using an excavator, barge & submersible dredging pumps to a depth of 5.6m. Removing existing sand materials to the required level and installation of geotextile ( 1000 gsm

Read More
Desalination Plant contractors
by adminFebruary 20, 2018in Offshore Pipeline Installation Projects

Desalination Plant at Duqm area in Al Wusta Region, Sultanate of Oman

The Union Dredgers scope for the Duqm project included the Design, Manufacture, Testing, Supply, Installation and Commissioning of a SeaWater Intake system made from HDPE Pipe. The project consisted of 3.9km of 710mm HDPE pipe used for the intake lines as well as a 7.8km of 75mm HDPE pipe used

Read More
Dredging contractors uae
by adminFebruary 20, 2018in Dredging Projects

Dredging works at Al Bandar, Al Raha Beach improvement

The supply of marine equipment & dredging of soft sand materials inside the marina to a depth up to -5.1 NADD

Read More
Intake and Outfall line
by adminFebruary 19, 2018in News

Intake and Outfall line for a Desalination plant at Al Ghubrah, Sultanate of Oman

Union Dredgers has been awarded a project which is the supply and Installation of an intake and outfall line for a Desalination plant located in Al Ghubrah in the Sultanate of Oman. The Scope of project: Supply of 4500 m of HDPE pipe with diameters of 2060 mm OD(1900 mm

Read More
Beach profiling uae
by adminFebruary 19, 2018in News

Beach profiling and re-profiling (dredging) in Dubai, UAE

Union  Dredgers and Marine Contracting (UDMC) secures project for beach profiling and re-profiling (dredging) in Dubai, UAE .

Read More
pipeline for wastewater treatment plant
by adminFebruary 19, 2018in News

Subsea extension of sea outfall pipeline for wastewater treatment plant in Ajman, UAE

Union Dredgers and Marine Contracting (UDMC) secures project for the subsea extension of sea outfall pipeline for wastewater treatment plant in Ajman, UAE.  UDMC is responsible for design, procurement, construction and installation of the complete offshore pipeline.

Read More
HDPE intake pipeline
by adminFebruary 19, 2018in News

HDPE intake pipeline for an integrated water and power plant (Ras Al Khaimah UAE)

Union Dredgers and Marine Contracting (UDMC) secures  project for the extension of an existing 1200mm HDPE intake pipeline for an integrated water and power plant in Ras Al Khaimah UAE.  UDMC is responsible for the supply  of pipeline components, welding, testing and pipeline installation offshore

Read More
  • 1
  • …
  • 7
  • 8
  • 9
  • 10
  • 11

Recent Posts

  • Preparation for Installation of Stormwater Outfall HDPE Pipeline in Palm Jebel Ali
  • Man Overboard Mock Drill Conducted at Palm Jebel Ali Site
  • Dredging & Stormwater pipeline Installation at Palm Jebel Ali – Fronds A-G
  • IMCA-Compliant Diving Inspection at Palm Jebel Ali
  • UDMC Safety Award – Recognizing Safety Leadership at Palm Jebel Ali

Recent Comments

No comments to show.

Latest Posts

  • Preparation for Installation of Stormwater Outfall HDPE Pipeline in Palm Jebel Ali

  • Man Overboard Mock Drill Conducted at Palm Jebel Ali Site

    Man Overboard Mock Drill Conducted at Palm Jebel Ali Site

  • palm-jebel-ali-stormwater-outfall-project

    Dredging & Stormwater pipeline Installation at Palm Jebel Ali – Fronds A-G

Categories

  • certifications
  • Dredging Projects
  • Marine Contracting
  • News
  • Offshore Pipeline Installation Projects

Tags

Union Dredgers Marine Contracting

Leading Marine & Dredging Services in the UAE

Get a free quote +971-7-243-1217

Links

About Us
Contact Us
Our News
Our Projects
Our Equipment

Other News

Preparation for Installation of Stormwater Outfall HDPE Pipeline in Palm Jebel Ali

April 16, 2026
Man Overboard Mock Drill Conducted at Palm Jebel Ali Site

Man Overboard Mock Drill Conducted at Palm Jebel Ali Site

March 16, 2026

Contact

Email

info@uniondredgers.com

Phone

+971-7-243-1217

Fax

+971 44307074
© All Copyright 2026 by Union Dredgers & Marine Contracting