Supply-and-Installation-of-OD500mm-HDPE-Outfall-Pipeline-in-Khorfakkan-Area.jpg

Supply and Installation of OD500mm HDPE Outfall Pipeline in Khorfakkan Area

Union Dredgers & Marine Contracting (UDMC) site team has commenced mobilization of our latest project that entails the comprehensive supply and installation of a OD500mm HDPE outfall pipeline spanning 1.3km in the vibrant Khorfakkan area. This critical infrastructure initiative involves several key components to ensure seamless operation and environmental compliance.

Read More

Cutter Section Dredger – Megalodon

Cutter Section Dredger – Megalodon GENERAL Year Built: 2022 Model: HID Flag: St Kitts & Nevis Class: Tasneef Port of Registry: Basseterre Official Number: SKN 1004459 Positioning System: Trimble CSD DIMENSIONS Length: 37m (O.A 46.5) Breadth: 8.8m Depth: 2.2m Suction Pipe Diameter : 560mm Discharge Pipe Diameter : 560mm dredging depth

Read More

Addition of new cutter suction dredger to fleet

Union Dredgers & Marine Contracting (UDMC) is proud to announce the addition of a new cutter suction dredger Megalodon to its fleet.  The new dredger, currently the largest in the UDMC Fleet has a discharge diameter of 560mm, a maximum flow capacity of 4500m3/h, a maximum dredging depth of 15m

Read More

Cutter Suction Dredger – Helicoprion

Cutter Suction Dredger GENERAL Year Built: 2022 Model: HID Flag:St Kitts & Nevis Class: Tasneef Port of Registry: Basseterre Official Number: SKN 1004348 Positioning System: Trimble CSD DIMENSIONS Length: 25m Breadth: 5.2m Depth: 1.6m Suction Pipe Diameter : 350mm Discharge Pipe Diameter : 350mm Max. dredging depth : 10m CAPACITY Main

Read More

Commissioning of new Cutter Suction Dredger

Union Dredgers (UDMC) is proud to announce the addition of a new cutter suction dredger Helicoprion to its fleet.  The new dredgers has a discharge diameter of 350mm, a maximum flow capacity of 1400m3/h, a maximum dredging depth of 10m in addition to a discharge length of 1000m. As a

Read More