palm-jebel-ali-stormwater-outfall-project

Dredging & Stormwater pipeline Installation at Palm Jebel Ali – Fronds A-G

Union Dredgers has commenced dredging works for an ongoing project at Palm Jebel Ali, covering Fronds A to G. The project includes the supply and installation of stormwater outfall pipelines along with a specialized outfall structure to improve water management in the area. Our vessels, Hammerhead and Helciprion, along with

Read More
Dredging Dubai

Dredging in the Dubai Marina

Union Dredgers has completed the dredging of the Dubai Marina channel. Utilising our dredging pump and customised dredging pontoon we were able to dredge the channel and relocatethe excess material to a stockpile location. The material was then loaded on to a flat top barge utilising a long reach excavator,

Read More