The Union Dredgers scope for the Duqm project included the Design, Manufacture, Testing, Supply, Installation and Commissioning of a SeaWater Intake system made from HDPE Pipe. The project consisted of 3.9km of 710mm HDPE pipe used for the intake lines as well as a 7.8km of 75mm HDPE pipe used for the chlorine and airburst pipelines.