- Design works such as ballast blocks, general arrangements, intakes, diffusers.
- Supply of all necessary material.
- Welding.
- Dredging works.
- Installation and commissioning.
- Surveys, drawings
Our Capabilities
Recent News
Dredging Works Begin for Seawater Outfall Line at Palm Jebel Ali
August 20, 2025
500mm HDPE Outfall Pipeline Installed in Khorfakkan Area
January 2, 2025
Marine Vessels for Hire with Crew for Coastal Dredging in the UAE
November 4, 2024
Remora vessel
August 16, 2023