Tug Boat – Laila
Length 20.66 m Width 6.01 m Depth 2.61 m Type of Hull : Steel Flag UAE Port of Registry Sharjah Official No 5356 Gross Tonnage 99 Net Tonnage 55 Year of Built 1992 Anchor Winch 1 No Anchors 2 No’s Generators 2 no’s ( Yanmar )
Length 20.66 m Width 6.01 m Depth 2.61 m Type of Hull : Steel Flag UAE Port of Registry Sharjah Official No 5356 Gross Tonnage 99 Net Tonnage 55 Year of Built 1992 Anchor Winch 1 No Anchors 2 No’s Generators 2 no’s ( Yanmar )
Cutter Suction Dredger GENERAL Year Built: 2005 Model: Italdraghe Flag:St Kitts & Nevis Class: Tasneef Port of Registry: Basseterre Official Number: SKN 1002198 Positioning System: Trimble CSD DIMENSIONS Length: 30.93m Breadth: 5.32m Depth: 1.53m Suction Pipe Diameter : 300mm Discharge Pipe Diameter : 300mm Max. dredging depth : 15m CAPACITY Main Diesel Engine: Cummins
DIGGER TYPE OF SHIP Backhoe Dredger (Non-Propelled) FLAG St Kitts & Nevis (POR: Basseterre) OFFICIAL NUMBER SKN 1002666 CLASSIFICATION IRS/Polski Rejestr Statków YEAR BUILT 1974 (1998 rebuild) PLACE BUILT Asia Pacific shipyard, Singapore OVERALL LENGTH 42.88 mtrs BREADTH 15.36 mtrs DEPTH 3.05 mtrs GRT/NRT 525/157 t EXCAVATOR TYPE O&K RH75 DREDGING
Dredging, back filling and installation of a 1400mm and 1200mm HDPE pipe and fittings for a Reverse Osmosis Desalination plant in Ajman. This Included: • Butt Fusion Welding and pressure testing of the HDPE pipes. • Installation of concrete blocks connected to the pipe • Sheet piling on shore and
The supply of marine equipment & dredging of soft sand materials at Dubai marina to a depth of up to 3.5m. Works involved Underwater Cutting and removal of the metal beams and rods which were projecting from the sea bed. Dismantling and removing from site the concrete blocks and boulders
Re installation of offshore Pipeline A along with Air Backwash & Chlorination pipelines for 5 MIGD Seawater Desalination Plant at Khorfakkan and Re installation of offshore pipeline B 5 MIGD Seawater Desalination Plant at Khorfakkan.
Installation of two 1200mm diameter pipe lines of 350 metres each and the installation of three outfall pipe lines with sizes of 1000 mm and 630mm at Ras Al Khaimah
Excavation and removal of materials under the bridges 1,2,12 & 13 and disposal of excavated materials to a distance of 5 kilometers using an excavator, barge & submersible dredging pumps to a depth of 5.6m. Removing existing sand materials to the required level and installation of geotextile ( 1000 gsm
The Union Dredgers scope for the Duqm project included the Design, Manufacture, Testing, Supply, Installation and Commissioning of a SeaWater Intake system made from HDPE Pipe. The project consisted of 3.9km of 710mm HDPE pipe used for the intake lines as well as a 7.8km of 75mm HDPE pipe used