Tug Boat – Laila
Length 20.66 m Width 6.01 m Depth 2.61 m Type of Hull : Steel Flag UAE Port of Registry Sharjah Official No 5356 Gross Tonnage 99 Net Tonnage 55 Year of Built 1992 Anchor Winch 1 No Anchors 2 No’s Generators 2 no’s ( Yanmar )
Cutter Suction Dredger – Hammerhead
Cutter Suction Dredger GENERAL Year Built: 2005 Model: Italdraghe Flag:St Kitts & Nevis Class: Tasneef Port of Registry: Basseterre Official Number: SKN 1002198 Positioning System: Trimble CSD DIMENSIONS Length: 30.93m Breadth: 5.32m Depth: 1.53m Suction Pipe Diameter : 300mm Discharge Pipe Diameter : 300mm Max. dredging depth : 15m CAPACITY Main Diesel Engine: Cummins
Backhoe Dredger – Digger
DIGGER TYPE OF SHIP Backhoe Dredger (Non-Propelled) FLAG St Kitts & Nevis (POR: Basseterre) OFFICIAL NUMBER SKN 1002666 CLASSIFICATION IRS/Polski Rejestr Statków YEAR BUILT 1974 (1998 rebuild) PLACE BUILT Asia Pacific shipyard, Singapore OVERALL LENGTH 42.88 mtrs BREADTH 15.36 mtrs DEPTH 3.05 mtrs GRT/NRT 525/157 t EXCAVATOR TYPE O&K RH75 DREDGING
Pipeline installation at RO Desalination plant, Ajman
Dredging, back filling and installation of a 1400mm and 1200mm HDPE pipe and fittings for a Reverse Osmosis Desalination plant in Ajman. This Included: • Butt Fusion Welding and pressure testing of the HDPE pipes. • Installation of concrete blocks connected to the pipe • Sheet piling on shore and
Dredging Works & Underwater Cutting & Removal Of Obstructions at Dubai Marina Quays
The supply of marine equipment & dredging of soft sand materials at Dubai marina to a depth of up to 3.5m. Works involved Underwater Cutting and removal of the metal beams and rods which were projecting from the sea bed. Dismantling and removing from site the concrete blocks and boulders
Offshore Pipe line Installation for Khorfakkan desalination plant
Re installation of offshore Pipeline A along with Air Backwash & Chlorination pipelines for 5 MIGD Seawater Desalination Plant at Khorfakkan and Re installation of offshore pipeline B 5 MIGD Seawater Desalination Plant at Khorfakkan.
Installation of Intake/Outfall pipeline at IWP plant
Installation of two 1200mm diameter pipe lines of 350 metres each and the installation of three outfall pipe lines with sizes of 1000 mm and 630mm at Ras Al Khaimah
Dredging Works under bridges Rock revetment under bridges 1 & 2
Excavation and removal of materials under the bridges 1,2,12 & 13 and disposal of excavated materials to a distance of 5 kilometers using an excavator, barge & submersible dredging pumps to a depth of 5.6m. Removing existing sand materials to the required level and installation of geotextile ( 1000 gsm